High Performance Pontiac Homepage High Performance Pontiac

0207hpp Reliably 03

Prev Next
Then the tray is installed again. The process is repeated until the tray mounts perfectly over the four bolt holes with no tension on it. The tray usually cracks right where the tube goes through. Note that we are using a 455 tray. There is a "5" barely visible on the top in this photo. The engine should be rotated after the tray is installed to ensure that there's no interference. The bolts get Loctite.
Running and Racing Reliably Part II: Continuing at the bottom

Then the tray is installed again. The process is repeated until the tray mounts perfectly over the four bolt holes with no tension on it. The tray usually cracks right where the tube goes through. Note that we are using a 455 tray. There is a "5" barely visible on the top in this photo. The engine should be rotated after the tray is installed to ensure that there's no interference. The bolts get Loctite.  View Related Article

 

Get Adobe Flash player